Bronx, NY 10457 A separate permit is required for each construction-related activity, except where otherwise provided in the Highway Rules or by permit stipulations. WORK HOURS ARE 7 AM - 8 PM MON-FRI AND 9 AM - 6 PM SAT. THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR FULL INTERSECTION RESTORATION AS AGREED TO WITH THE BOROUGH ASHO'S OFFICE. NYC Parks & Recreation The guidance presented in the Street Works Manual does not supersede any existing federal, state or city laws, rules and regulations. Office hours: 8:30 AM-4:30 PM. NYC DOT inspects sidewalks for defects and when a defect is identified, a Sidewalk Violation is issued to the property owner and a copy is submitted to the County Clerk's office. Enter all persons authorized to obtain permits for the applicant, their affiliation to the applicant and their telephone number and email address. Some of the features on CT.gov will not function properly with out javascript enabled. A list of the forms most commonly used during this process can be found inAppendix B, Forms. BQE Central Workshops. The Bridge Hold Map shows locations where Bridge holds apply. A $35 filing fee is required for all vault applications. 10 Richmond Terrace MAY ALSO WORK 7PM TO 11PM WEEK DAYS ONLY FOR THE PURPOSE OF DEP INSPECTION WITH INSPECTOR ON SITE. New York, New York 10041. Permit Management & Construction Control Permit by Mail DURING NON-WORKING HOURS PEDESTRIAN WALK WAY MUST BE MAINTAINED ON SIDEWALK OR ON ROADWAY. Exceptions include, Ribbon sidewalks are appropriate in R1-R6 zoning districts; full sidewalks are used elsewhere, Sidewalks should be as wide as possible appropriate to foot traffic and available street width, Sidewalks should always be provided on both sides of the street, A parks internal path located near a roadway does not substitute for a sidewalk, If the sidewalk is more than 25 feet wide, there should be a clear path adjacent to the building line and an 8-foot clear path adjacent to the curbside furnishing zone. Foundation MaterialWhen replacing a concrete sidewalk, the foundation material may be retained and graded to the required subgrade. Regular Input and Attendance of Decision Makers at Coordination NYC Parks & Recreation THIS STIP IS USED FOR WORK THAT FALLS BETWEEN LANES AND REQUIRES THE CONTRACTOR TO RESTORE THE ROADWAY FROM 1' PAST THEIR RESTORATION TO THE NEAREST CURB FOR THE LENGTH OF THEIR WORK. The maximum transverse slope permitted for vault covers, gratings and other sidewalk structures is 1" in 5'. Resources | NYC Street Design Manual Resources The following are laws, rules, regulations, and design guidance documents that may be relevant to the design of streets. DURING THESE CLOSURES ALL CONSTRUCTION EMBARGOS AND/OR TEMPORARY CONSTRUCTION PARKING RESTRICTIONS MUST BE COMPLIED WITH. NOTE: This list of permit stipulations is provided as a reference tool, for informational purposes only. Office hours: Applications accepted, only from 8:00 AM to 11:30 AM; Workers pour cement during sidewalk reconstruction. Standard Sheets (US Customary) - New York State Department of OCCUPY A MAXIMUM OF 12 FT OF ROADWAY FOR ASBESTOS REMOVAL ONLY BETWEEN THE HOURS OF 7PM - 6AM, MAINTAIN TWO 11 FOOT LANES, ONE 11 FOOT LANE ON EACH SIDE OF THE EXISTING DOUBLE YELLOW CENTER LINE, MAINTAIN FOUR 11 FOOT LANES, TWO 11 FOOT LANES ON EACH SIDE OF THE EXISTING DOUBLE YELLOW CENTER LINE, MAINTAIN TWO 11 FOOT LANES, ONE 11 FOOT LANE ON EACH SIDE OF THE EXISTING CENTER MALL. 3.1 General Provisions For Construction-Related Permits ONE 11-FOOT LANE MAY REMAIN CLOSED FOR CONCRETE CURING ONLY, ON WEEKENDS, DEFINED AS 12:01AM SATURDAY THROUGH 6AM MONDAY. Applicant should submit this form with the appropriate documentation and waiver request fee. When utility company representatives mark a location, they use colored flags and/or paint to identify the type of underground service: Streets can hide a complex infrastructure of underground utilities. Original insurance certificates for Commercial General Liability (CGL) insurance and Worker's Compensation insurance. Plan Examination Unit NYC ADMINISTRATIVE CODE, 19-142, WORKERS ON EXCAVATIONS: A PERSON TO WHOM A PERMIT MAY BE ISSUED, TO USE OR OPEN A STREET, SHALL BE REQUIRED, BEFORE SUCH PERMIT MAY BE ISSUED, TO AGREE THAT NONE BUT COMPETENT WORKERS, SKILLED IN THE WORK REQUIRED OF THEM, SHALL BE EMPLOYED THEREON, (CONT. Transformer vaults are typically installed, owned and maintained by an electric utility company. The screen image below displays the "NYC DOT 10 year Capital Plan" projects in green and protected streets in blue. USE OF NO STOPPING ZONES, NO STANDING ZONES AUTHORIZED PARKING, DIPLOMAT PARKING AND TAXI ZONES IS PROHIBITED. By accessing this map portal, a utility company or any other entity that performs street excavation work can find details on NYC DOT projects included in the city's 10-year Capital Budget, as well as more imminent NYC DOT and New York City Department of Environmental Protection capital projects currently in design or under construction. 1150 Clove Rd. There is a central Permit Office in Manhattan and borough Permit Offices in each of the other boroughs. Listed in the following paragraphs are some of the requirements for canopy authorizations and permits. MANTAIN 1 13 FOOT LANE EAST BOUND, 1 15 FOOT LANE WEST BOUND. If the location is deemed suitable, HIQA signs the Canopy Authorization Form indicating HIQA approval and returns it to the applicant. The applicant may be required to address the circumstances of a hold before a permit is released. To request authorization for the installation of a canopy, an applicant must initiate the process at the HIQA office in the borough where the proposed canopy will be located. CONSTRUCTION ZONE LAYOUT MUST BE IN ACCORDANCE AND COMPATIBLE WITH ANY AND ALL NYC DEPARTMENT OF BUILDINGS (DOB) AND NYC FIRE DEPARTMENT (FDNY) FIRE AND EMERGENCY EVACUATION REGULATIONS/CODES AND PRACTICES. COORDINATE WITH NYSDOT PRIOR TO WORK. Sub title REVISED DRAWINGS COVERING PEDESTRIAN RAMPS Agency Design and Construction, Department of (DDC) Additional creators DDC & DOT Subject Traffic Safety Transportation Streets and Highways Report type A DOB-approved plan must be obtained and submitted to PEU with the application for a final approval and permit. A temporary sidewalk closure while a sidewalk repair is underway. New York City Department of Consumer Affairs (DCA) Concretemust be poured and finished in accordance with NYC DOT Standard Highway Specifications. Please note that although permits can be submitted, paid for and printed out 24/7, the permit review process occurs only during normal weekday Permit Office hours. Canopy authorizations and permits are required to place a canopy over the sidewalk. There are two categories of HIQA holds: Holds for Specific Permit Type or Unique Street Treatment and Holds that May Be Placed on the Permittee. New York, NY 10038 Resources | NYC Street Design Manual All links are subject to change. Orders, given orally or in writing, may be issued by the Commissioner to cease and desist work or to perform remedial action. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. Some of the requirements include, but are not limited to the following, where the applicant must: New York 811 is a nonprofit organization that acts as a communications link between utility companies and individuals planning any digging activity in the five boroughs of New York City and Nassau and Suffolk Counties on Long Island. IF LOCATION IS IN SCHOOL ZONE AS SPECIFIED IN SCHOOL STIPULATION, MAY ONLY WORK 9 AM TO 2 PM MON TO FRI WHEN SCHOOL IS IN SESSION (083 STIPULATION). Costs: Shown for each pole or luminaire as a $ symbol, representing relative costs compared to the Standard Street Light (SSL), the Octagonal Pole. Only a canopy installer or authorized agent that is registered with NYC DOT can apply for a permit to install the canopy. IF PERMIT ALLOWS WORK TO 6PM WEEKDAYS WORK MAY ALSO OCCUR FROM 6PM TO 11PM WEEKDAYS FOR THE PURPOSE OF DEP INSPECTION ONLY WITH INSPECTOR ON SITE. Canopy placement must be adequate for public safety and must be suitable to the circumstances of the proposed canopy location and not interfere with the public use of the sidewalk. See the state links below for available standard drawings. Tel: (718) 965-7750, Manhattan Download a PDF of the Lighting chapter for offline access to the content in this section. CRBRES-RESTORE AS PER SKETCH #2 OF DOT'S PROTECTED STREET RESTORATION REQ'MENTS. Typical treatments include removing vault roof near curb, filling flowable lifts, and breaking vault floor. If the application and its supporting documentation are accepted, the OCMC Project Manager (PM) reviews the application and all associated documents and adds the permit stipulations to the permit application. It is important that contractors and utility companies are responsible partners as well in order for coordination to be effective. Full Sidewalk | NYC Street Design Manual Additional requirements are contained in Sections 2-02 and 2-11 of the Highway Rules and should be consulted before any work is performed on the street. The New York City Department of Transportation (NYC DOT) has adopted specifications and regulations stipulating how street work must be performed in order to minimize disruption and maintain the integrity of the street surface. Further information on responding to CARs may be found in the Highway Rules, Section 2-02(d). Specific requirements for filling in abandoned vaults can be found in Section 2-13(o) of the Highway Rules. ALL WORK MUST BE PREAPPROVED BY LANDMARK PRESERVATION COMMISSION. All street lighting designs must be approved by DOT Street Lighting Engineering Unit. The minimum slope, calculated on a line perpendicular to the curb, must be 1" in 5', and the maximum is limited to 3" in 5'. Long Island City, NY 11101 NYC DOT has a separate procedure for obtaining permits for emergency street opening/excavation work so that applicants can expeditiously obtain such permits. Permit Bond. PLACE LEFT LIGHTED ARROW BOARD 24/7 NE CORNER OF AMSTERDAM AVE/W.60 ST. NO IMPACT ON 4 TRAVEL LANES AT ANY TIME. BLKRES-RESTORE AS PER SKETCH #4 OF DOT'S PROTECTED STREET RESTORATION REQ'MENTS. A full sidewalk accommodates both pedestrian traffic and a range of street furnishings and fixtures. Copies of incorporation papers, licenses, and business certificate or filing receipt filed with the state of New York. FULL WIDTH OF ROADWAY SHALL BE OPENED TO TRAFFIC WHEN SITE IS UNATTENDED. Canopy permits are generally taken out by building owners, business owners, and canopy installers. Street Works Manual The protected streets layer is current as of the previous business day. The Department of Transportation (DOT) maintains and installs New York City parking regulation signs. Connecticut Department of Transportation Second, after obtaining HIQA's authorization, the applicant must obtain a permit to install the canopy at the approved location and apply for a permit to maintain the canopy once it is installed. SIGNS SHALL BE POSTED MIN OF 48-HRS PRIOR TO START OF WRK & IMMEDIATELY REMOVED UPON COMPLETION OF WRK OR PERMIT EXPIRATION. Signs must be conspicuously displayed and face the nearest curb line. NO WORK CAN OCCUR WITHIN 2 BLOCKS OF AN ACTIVELY OPERATING NYCDDC SITE. (212) 839-9561/9566 Learn about ParkNYC. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL EQUIPMENT, VEHICLES AND PERSONNEL ON OR AROUND WORK SITE. Chapter 2 describes processes and tools to enhance advance planning and coordination of street work between NYC DOT's own capital resurfacing and reconstruction programs and the street infrastructure work of other stakeholders, especially those that perform a large number of street excavations. NO OCCUPANCY OF ROADWAY OF PERMITTED AFTER WORKING HOURS. Any foundation material not meeting specifications must be removed. COORDINATE CONSTRUCTION ACTIVITY WITH THEATRE GROUPS PRIOR TO WORK. Only in circumstances where the applicant can demonstrate that the work could not have been reasonably anticipated prior to the street resurfacing/reconstruction will an application for a Street Opening Permit on a Protected Street be reviewed. PROVIDE 5 FEET FOR PEDESTRIANS ON SIDEWALK OR IN CURB LANE. PERMITTEE SHALL NOT MOVE, DAMAGE OR DISRUPT THE OPERATION OF THE STATION. However the permit window remains open until 5:00 PM to pick up permits. The Queens borough permit office is located in Queens Borough Hall. Office hours: 8:30 AM-3:30 PM (in person) Details about the exact holiday embargo dates, times, and locations are posted on NYC DOT's Special Traffic Advisory page, generally in mid-October. IT IS THE PERMITTEE'S RESPONSIBILITY TO COORDINATE WITH DDC'S WALL STREET WATER MAIN PROJECT EIC AT (212)791-8170 PRIOR TO BEGINNING A WORK OPERATION. Provide an unobstructed clear path of 8 feet or one half the sidewalk width (whichever is greater) in commercial, high-density residential, and transit-adjacent areas Sidewalks in low-rise residential areas should be at least 5 feet wide Wherever possible, sidewalk cross-slope should not be greater than 2%
Sports Injury Statistics Uk,
Brook Smith Louisville, Ky,
Articles N